FAQ Topic: Village Projects
It is not littering, the toilet paper acts as a sealant to hold the tar in place after the crew has performed road crack filling, allows for traffic to drive on it immediately, and prevents it from sticking to car tires which will pull the tar out of the roadway.
The grass seed that the Village uses takes anywhere from 10-21 days to show signs of growth. There are so many variables that play into this such as the time of year, temperature, and moisture being the main factors. If restoration has happened in your yard, please help the Village out and give it some … Continued
Eventually, yes. The Village maintains a program by the State of Wisconsin called the Pacer Program. This program rates every road in the Village of Bayside. During the culvert project, residents have the option to find a private contractor to perform the work or use the Village’s out of network program. The out of network … Continued
New grass needs to be watered daily to grow; most failed restorations are from not watering new grass. Normal germination or sight of grass growth is between 10-21 days.
Driveways, and the subsequent culvert, repairs are the responsibility of the homeowner. If you’re planning to have your culvert replaced, you must apply for an impervious surface/culvert permit.